Log new ClickUp tasks in Google Sheets
Watch selected Workspaces and retrieve each task's current details. Create the log once, then append task ID, name, status, List and direct URL as RAW values, keeping formula-looking names as text.
App integration
Log new ClickUp tasks in Google Sheets with ID, name, status, List and task link. The first event creates the spreadsheet and its five headers.
Ready-made workflows
Read each new task, create an activity-log spreadsheet on the first run and append later tasks to the same file. The register records creation activity rather than maintaining a live task board.
Watch selected Workspaces and retrieve each task's current details. Create the log once, then append task ID, name, status, List and direct URL as RAW values, keeping formula-looking names as text.
Before activation
Connect ClickUp and choose the Workspaces to watch. The source covers new tasks across their accessible Lists; the List open in ClickUp does not limit it.
Choose the account that will own the log. No spreadsheet or headers need preparing. Review the creation settings and who should read the task names and status data.
Activate and wait for the trigger connection. Create a fictional task, inspect its row, then create another to confirm the next row uses the same spreadsheet. Check the task lookup if a row is missing.
The first event creates a spreadsheet with Task ID, Task name, Status, List and ClickUp link headers. Later runs of the same workflow copy reuse that file. Each separate workflow copy gets its own generated log.
This prepared trigger watches the Workspaces selected in FastHook, across Lists the account can access. It has no List filter and is not limited to the List currently open in ClickUp. Review Workspace scope before activation.
The webhook gives a task ID and the workflow reads current details during the run. Changes made between creation and lookup can affect the row. A deleted or unreadable task cannot be retrieved. Only ID, name, status, List and link are copied; descriptions, Custom Fields, assignees, comments and attachments stay in ClickUp.
No. Existing tasks are not imported and later status changes, edits or deletions do not update rows. A deleted log is not automatically replaced; changing creation settings after its first successful run needs a new creation step. Reruns can append duplicate rows. RAW keeps names as data, and task links still require ClickUp access.