New Row Added
Observe newly appended rows after the first baseline poll. Use Title, Start and End headers in row 1 and prepare a complete event before adding its row.
Workflow template
Create Google Calendar events from newly appended schedule rows. Map Title, Start and End to a writable calendar using timestamps with explicit timezone offsets.
How it works
Observe newly appended rows after the first baseline poll. Use Title, Start and End headers in row 1 and prepare a complete event before adding its row.
Create a separate event in your selected calendar with the row’s title, start and end timestamps. The prepared send_updates value is none, and no attendees are mapped.
The result
Example Studio planning workshop
Start: 2026-09-22T10:00:00+02:00 End: 2026-09-22T11:00:00+02:00 Attendees: None configured
Fictional event. Times include an explicit offset; the destination calendar controls display, visibility and default reminders. No event ID is written back to the sheet.
Before activation
Put Title, Start and End in row 1. Use RFC 3339 timestamps with a timezone offset, such as 2026-09-22T10:00:00+02:00 and 2026-09-22T11:00:00+02:00. End must be later than Start.
Connect Google Sheets and select the spreadsheet and worksheet. Connect Google Calendar with permission to create events and choose a writable calendar, preferably a dedicated test calendar first.
Activate and wait for the first poll, then append a complete fictional event. Compare its title, duration and displayed timezone with the original timestamps. Review the destination calendar’s default reminders and visibility.
Timestamps must include the offset. Start and End are mapped directly to event times. Use RFC 3339 date-time values and ensure End is later. The recipe has no completeness filter, conflict checker or separate timezone conversion step.
This creates events without invitations. No attendees are mapped and send_updates is none. Visibility and default reminders follow the destination calendar; they are not individually set by the sheet mappings.
Later edits do not synchronize events. Existing rows are skipped by the initial baseline. Keep headers stable and avoid deleting or reordering rows. Each new row creates a separate event; reruns can duplicate it, and event IDs are not written back.
Use RFC 3339 timestamps with a timezone offset, for example 2026-09-22T10:00:00+02:00 and 2026-09-22T11:00:00+02:00. End must be later than Start. Plain dates or ambiguous local times do not match this prepared mapping.
No. It maps each newly appended row into a separate event. There is no conflict lookup, completeness filter or existing-event update step.
No attendees are configured and send_updates is none. The destination calendar controls event visibility and default reminders.
No. Existing rows and later edits are not imported or synchronized. The workflow does not store event IDs in the sheet, and reruns can create another event.